皇冠平台出租:Greater earnings visibility for Gamuda

皇冠平台出租www.hg108.vip)是皇冠(正网)接入菜宝钱包的TRC20-USDT支付系统,为皇冠代理提供专业的网上运营管理系统。系统实现注册、充值、提现、客服等全自动化功能。采用的USDT匿名支付、阅后即焚的IM客服系统,让皇冠代理的运营更轻松更安全。

One of Gamuda's projects on the outskirts of Kuala Lumpur. - File pic

PETALING JAYA: Gamuda Bhd’s contract win from Pengurusan Air Selangor Sdn Bhd valued at RM1.97bil is expected to provide the infrastructure group greater earnings visibility over the next three years.

Last Friday, the group said it won Package 1 of Rasau Water Supply Scheme (phase one) worth RM1.97bil. Gamuda is the main contractor for this project, which will start on July 15 and targeted for completion on June 30, 2025.

It is Gamuda’s first major job win in Malaysia for 2022 and will bring its outstanding order book to a new record high of RM14.4bil.

Where project margins are concerned, Kenanga Research said they are similar to historical levels

“Year-to-date order book replenishment stood at RM11.7bil, tracking in line with our RM12.5bil target for financial year 2022 (FY22). Consequently, outstanding order book is raised to RM14.4bil.

“Gamuda guides that the pre-tax profit margins for this project will range between 8% and 10% – similar to their historical construction pre-tax profit margins registered between FY18 and FY21, with the exception of FY20 which was affected by the pandemic,” said the research firm.

Kenanga Research noted that margins for this contract were relatively protected by price escalation clauses built in for key raw materials.

However, it made no change to its FY22-FY23 earnings estimates as the contract win was within the research firm’s replenishment target.

,

约搏以太坊www.eth108.vip)采用以太坊区块链高度哈希值作为统计数据,约搏以太坊游戏数据开源、公平、无任何作弊可能性。

,

It also kept its “outperform” call with an unchanged target price of RM4.20.

Meanwhile, UOB Kay Hian Research (UOBKH) said that based on the margin assumption of 6% to 8%, the project may potentially contribute RM30mil to RM50mil per year over the contract period.

“We are positive on this new win as it shows that Gamuda continues to be a strong local contender on top of securing multiple major regional wins year-to-date,” added UOBKH.

The research house said Gamuda has managed to more than triple its order book, taking into account recent project awards, which include two major projects in Australia valued at RM8.5bil. Besides this, it has secured projects in Singapore and Taiwan.

Locally, with the MRT2 near completion, UOBKH said that Gamuda aims to replenish its order book by RM20bil in FY22-FY23 and around RM8bil to RM10bil a year after that.

The research firm expects the group’s fourth quarter of FY22 earnings to remain strong, driven by MRT2 and other property projects.

As for its proposed highway disposal, the research house noted that it was progressing well.

Following shareholders’ approval, which is expected to be secured in July, the next step would be the RM5.5bil sukuk to be raised by not-for-profit entity Amanat Lebuhraya Rakyat.

  • 评论列表:
  •  telegram群组搜寻器(www.tel8.vip)
     发布于 2022-08-28 00:00:32  回复
  • 在市场上,每公斤黑松露的售价高达900欧元,但是当地农民普遍对其未来感到悲观,“因为夏季缺少足够的雨水,过去5年的产量锐减90%。”据悉,接下来数周原本正是黑松露交易的高峰期,但气候变化严重影响了黑松露市场。可以日更吗

添加回复:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。